In the great state of Washington, Mervin’s electricity is 89.6% hydro electric, which makes a lot of sense when they are getting world record snowfalls at Mt. Baker. On top of that the factory heating system runs on a renewable based biodiesel. Enjoy a behind the scenes look at the factory with Pete Saari, co-founder of Mervin Manufacturing, and take a trip through the renewable process used to power your boards.

More from SNOWBOARDER Magazine here!